We will become a logistics center company in Northeast Asia by maximizing customer satisfaction.
Logistics Center IntroductionLocatedted in the logistics complex behind Incheon Airport(FTZ), a total of 20,000 pyeong is occupied by transportation, packaging, console and special container rental companies. We believe it is the highest competitive logistics infrastructure in the region.
Division | CenterⅠ | Center Ⅱ | |
General Warehouse | 10,340(Pyeong) | 11,000(Pyeong) | |
Width | 1F | 199m x 77m | 220m x 77m |
3F | 77m x 77m | 220m x 55m | |
77m x 77m | |||
Height |
1F | General 12m | General 12m |
2F Lower 6.45m | 2F Lower 6.8m | ||
3F | General 9~13.5m | General 11~14m | |
4F Lower 6m | 4F Lower 5.8m | ||
Canopy Area | 1F | 8m | 11m |
3F | 6m | 8m | |
Floor Load | 1F | 3t / ㎡ | 3t / ㎡ |
3F | 2t / ㎡ | 2t / ㎡ | |
Door Size | 1F | 9m x 5m | 9m x 5m |
3F | 5m x 5m | 9m x 5m | |
Luminance | 300 lux | 300 lux |
Step 1) Requesting availability of warehouse
-inquire about the current state of vacancies and when they can be used
Step 2) Writing / submitting an intent to use (online possible)
Step 3) Contact and decision
-Decide and contact through order and evaluation
Step 4) Contracts
-3 months deposit after obtaining a contract (approval of a contract with Incheon Airport)
Step 5) Deposit deposit
-Deposit deposit before contract start date
Step 6) Approval and Construction
-Installation and Construction of Occupant Required Facilities
Step 7) Occupancy and warehouse use